Main Street Survey Activities Block 11B/12B South Coast, South Africa

30 June 2025 | Client: Main Street 1549 (Pty) Ltd

Main Street held Exploration Right 12/3/067 over Block 11B/12B, located off the South Coast of South Africa, roughly between Mossel Bay and Cape St. Francis. Following the discovery of gas-condensate at the Brulpadda and Luiperd wells within Block 11B/12B, the joint venture partners at the time, under the lead of TotalEnergies EP South Africa (TEEPSA), started the associated ESIA process, which included a public participation process conducted in 2022 and 2023.

Following the withdrawal of some joint venture partners in late 2024, Main Street remains as the sole applicant of the EA Application and proposes to initially conduct a downscaled and largely non-intrusive survey campaign along the potential production sites and pipeline routes from the deep-water field areas in Block 11B/12B onto the shelf and into the adjacent Block 9 (Block 9 is held by PetroSA). The findings of this survey will provide essential data that informs the design and layout of the subsea production facilities and associated infrastructure.

The area of interest (AOI) is >65 km offshore in water depths between 100 m and 2 200 m. The proposed surveys include bathymetry, sonar, seafloor sampling, metocean and ROV surveys in a maximum survey area of interest measuring 8 620 km2 within portions of Blocks 11B/12B and 9.

Prior to the commencement of the Proposed Project, an Environmental Authorisation in terms of the Environmental Impact Assessment Regulations, 2014, (GN R 982 of 2014), promulgated under the National Environmental Management Act, 1998 (No. 107 of 1998) from the Department of Mineral and Petroleum Resources (DMPR) is required.

SLR Consulting (South Africa) (Pty) Ltd (SLR), an independent firm of Environmental Assessment Practitioners, has been appointed to manage the environmental authorisation processes.

Contact

Stakeholder Engagement Team

Email: 11b12bsurveys@slrconsulting.com

Telephone: Tel: (021) 461 1118 | SMS/WhatsApp: 071 586 5881

Status

Public Review of Draft ESIA

Notice is hereby given, in terms of the EIA Regulations, 2014 promulgated under NEMA, that the Environmental and Social Impact Assessment (ESIA) Report and its Non-Technical Summary (NTS) prepared for the above-mentioned project have been made available for a 30-day public review and comment period from 14 July 2025 – 14 August 2025.

Should you and/or your organisation wish to comment on any aspect of the ESIA, comments should be forwarded to SLR at the email address and telephone number shown above. For comments to be included in the ESIA prepared for decision-making purposes, they should reach SLR by no later than 14 August 2025.

All stakeholders are also cordially invited to attend the public open days. The objectives of these public open days are to provide an overview of the project proposal and findings of the ESIA process, as well as provide stakeholders a further opportunity to comment.

Please download the notification letter below for detailed information on the documentation locations, public open days and online virtual meeting.

Public Review of Draft Updated SLP

In terms of Regulation 42 of the Mineral and Petroleum Resources Development Regulations, 2004 (as amended), all production right applications must include a Social and Labour Plan (SLP).EVA Solutions has prepared the draft updated SLP, and a summary of the key changes. These documents are also available for public review from 14 July 2025 to 14 August 2025.

Should you and/or your organisation wish to comment on any aspect of the Updated SLP, comments should be forwarded to EVA Solutions at the email address and telephone number shown above. For comments to be included in the SLP prepared for decision-making purposes, they should reach EVA Solutions by no later than 14 August 2025.

EVA Solutions – Social and Labour Plan Consultants

By providing your personal information to submit a comment or RSVP to attend meetings and/open days, you will be included in the SLR an Interested and Affected Party (I&AP) database, and you consent to SLR managing your information in accordance with the Protection of Personal Information Act 4 of 2013. It is assumed that as an I&AP for this Project you authorise SLR to retain and use your Personal Information as part of a contact database for this and/or other Social and Environmental Impact Assessments (ESIA) and that you confirm your acceptance for SLR to contact you regarding this and/or other ESIA processes. SLR will not process your Personal Information, other than as permitted or required by ESIA processes, or as required by law or public policy. SLR will use reasonable, appropriate security safeguards to protect Personal Information, and to reasonably prevent any damage to, loss of, or unauthorised access or disclosure of Personal Information, other than as required for ESIA processes or as required by any Law or public policy. You may request for your Personal Information to be deleted from the I&AP database at any time by contacting SLR.