Our recent study [1] for The Crown Estate, analysing the costs and benefits of designing and operating offshore electricity transmission infrastructure for a longer lifespan is now available for download via the Marine Data Exchange.

The study compares the lifecycle of transmission assets at an offshore wind farm using a 30-year scenario and a longer-life 60-year scenario. The work explores the technical and economic feasibility of whether offshore transmission could be designed, operated and maintained for up to two offshore wind farm life cycles.

The results suggest that designing and operating offshore electricity transmission infrastructure for a longer lifespan has the potential to be more cost effective than current practice.

References

[1] Longer Offshore Transmission Design Life Study

Recent posts

  • Fire alarm mounted on wall
    Insight

    22 April 2025

    4 minutes read

    Understanding sound flanking: Fire alarm speaker cable conduits in multi-family buildings

    by Neil Vyas


    View post
  • Forested path
    Insight

    15 April 2025

    1 minute read

    2025 State of ESG: Insights from the frontlines of private markets


    View post
  • Insight

    14 April 2025

    5 minutes read

    ESOS: Insights, lessons learnt, and decarbonisation

    by Lee Jukes


    View post
See all posts