Our recent study [1] for The Crown Estate, analysing the costs and benefits of designing and operating offshore electricity transmission infrastructure for a longer lifespan is now available for download via the Marine Data Exchange.

The study compares the lifecycle of transmission assets at an offshore wind farm using a 30-year scenario and a longer-life 60-year scenario. The work explores the technical and economic feasibility of whether offshore transmission could be designed, operated and maintained for up to two offshore wind farm life cycles.

The results suggest that designing and operating offshore electricity transmission infrastructure for a longer lifespan has the potential to be more cost effective than current practice.

References

[1] Longer Offshore Transmission Design Life Study

Recent posts

  • Aerial View of a Snow Covered Data Center Campus in a Frozen Winter Landscape
    Insight

    04 September 2026

    3 minutes read

    Keeping snow out: Designing HVAC to minimize snow infiltration

    by Tahrana Lovlin


    View post
  • trariwe, pueblos indígenas, derechos humanos
    Insight

    03 September 2026

    6 minutes read

    Derechos Humanos y pueblos indígenas: una nueva frontera para la gestión territorial

    by Javier Fernández


    View post
  • Beautiful winding road across the Innes National Park with car at sunset time
    Insight

    03 September 2026

    4 minutes read

    Same rules, different realities: Australia's first ASRS assurance cycle and what it taught us

    by James Balik-Meacher, Ashleigh Turner, Sushmika Shetty


    View post
See all posts