Challenge

SLR undertook the detailed design of the Cell 1 final cover system at Mudgee Solid Waste Facility. The scope included designing the cover system to optimise landfill void space whilst considering site and environmental constraints, as well as safe construction and operation.

Solution

For this project, SLR developed a design incorporating a waste ‘piggy-back’ liner system, FLAC analysis, leachate interception and collection trench design, landfill Gas (LFG) biofilter treatment system design, HELP modelling and leachate storage pond design, slope stability assessment, LFG generation modelling, LFG and surface water modelling.

The team also provided an accompanying fill plan, construction cost estimate and specification documentation to accompany the design including a technical specification, quality assurance plan and bill of quantities.

Impact

Overall, the project was a success as it provided the client with several years of additional fill capacity, based on the review of the final landform and the piggy-backing concept that was applied.


Related projects

See all projects
  • Project

    Clyde Valley, Scotland

    Clyde Valley Partnership

    Infrastructure

    Clyde Valley residual waste contract


    Read more
  • Project

    Sydney, New South Wales, Australia

    Cleanaway

    Infrastructure

    Erskine Park resource management facility


    Read more
  • Project

    Queensland, Australia

    Multiple Local Councils

    Government & Communities

    Regional Waste and Resource Recovery Management Plans for Darling Downs and South West Queensland


    Read more