SLR wins ACEC MA Silver Engineering Excellence Award for Quinapoxet Dam Removal

Post Date
13 April 2026
Read Time
1 minute
Fernanda Mastroluca, Molly Swope, Taylor Rose, Matt Rose, and John Gregoire accepting the ACEC MA Engineering Excellence Silver Award at the Gala

SLR has been awarded a Silver Engineering Excellence Award for the Quinapoxet Dam removal and river habitat restoration project from the American Council of Engineering Companies of Massachusetts (ACEC-MA).

About the Dam Removal

SLR was retained by the Massachusetts Division of Ecological Restoration (MA DER) to conduct an initial feasibility study and provide hydraulic modeling for the removal of the Quinapoxet Dam in West Boylston, Massachusetts.

The project focused on removing a dam built in 1905 as part of the infrastructure supporting the Wachusett Reservoir. Over time, the dam became obsolete, prompting the client to pursue its removal and restore the Quinapoxet River’s natural flow.

Dam removal required careful engineering, environmental, and regulatory planning to manage river flow, sediment, construction sequencing, habitat restoration, fish passage, permitting, and archeological survey.

Quinapoxet Dam removal and river habitat restoration


Read the full project profile below

View project
Aerial view of Quinapoxet River Dam in West Boylston Massachusetts

Recent posts

  • Cover of Sustainability Report on a tablet screen
    News

    16 July 2026

    4 minutes read

    SLR releases 2025 Sustainability Report and Climate and Nature Report

    by Sarah Gillett


    Read more
  • Cornish Lithium Trelavour Lithium Project. Credit Cornish Lithium
    News

    10 July 2026

    3 minutes read

    SLR supports Cornish Lithium to advance sustainable lithium development in Cornwall


    Read more
  • Young woman watching video on demand on her TV
    News

    30 June 2026

    4 minutes read

    DIMPACT commissions new research to manage the carbon impact of AI video generation


    Read more
See all posts