SLR wins ACEC MA Silver Engineering Excellence Award for Quinapoxet Dam Removal

Post Date
13 April 2026
Read Time
1 minute
Fernanda Mastroluca, Molly Swope, Taylor Rose, Matt Rose, and John Gregoire accepting the ACEC MA Engineering Excellence Silver Award at the Gala

SLR has been awarded a Silver Engineering Excellence Award for the Quinapoxet Dam removal and river habitat restoration project from the American Council of Engineering Companies of Massachusetts (ACEC-MA).

About the Dam Removal

SLR was retained by the Massachusetts Division of Ecological Restoration (MA DER) to conduct an initial feasibility study and provide hydraulic modeling for the removal of the Quinapoxet Dam in West Boylston, Massachusetts.

The project focused on removing a dam built in 1905 as part of the infrastructure supporting the Wachusett Reservoir. Over time, the dam became obsolete, prompting the client to pursue its removal and restore the Quinapoxet River’s natural flow.

Dam removal required careful engineering, environmental, and regulatory planning to manage river flow, sediment, construction sequencing, habitat restoration, fish passage, permitting, and archeological survey.

Quinapoxet Dam removal and river habitat restoration


Read the full project profile below

View project
Aerial view of Quinapoxet River Dam in West Boylston Massachusetts

Recent posts

  • Fernanda Mastroluca, Molly Swope, Taylor Rose, Matt Rose, and John Gregoire accepting the ACEC MA Engineering Excellence Silver Award at the Gala
    News

    13 April 2026

    1 minute read

    SLR wins ACEC MA Silver Engineering Excellence Award for Quinapoxet Dam Removal


    Read more
  • Abstract wavy lines representing digital modelling
    News

    09 April 2026

    6 minutes read

    SLR launches enhanced Digital Services following acquisition of leading climate-modelling and analytics platforms


    Read more
  • Planetrics logo
    News

    09 April 2026

    3 minutes read

    SLR acquires Planetrics


    Read more
See all posts