Hazard identification and risk assessment – early and late lifecycle activities

Post Date
22 January 2023
Read Time
2 minutes
Worker in orange hi-vis and hard hat beside a large turbine rotor shaft in a workshop

Within the field of process safety there are regulatory requirements to perform hazard identification and risk assessment (HIRA) using techniques which fall under the generic banner of process hazard analysis (PHA). The most prevalent form of PHA is the Hazard and Operability (HAZOP) study technique, however most companies’ understanding of this technique comes from HAZOP #3 rather than earlier or later HAZOP lifecycle phases.

Early HAZOP Stages – HAZOP#1

By the time that the HAZOP#3 is conducted, many opportunities to reduce risks have already been lost which could in turn lead to more expensive engineering costs to manage risks which could have been eliminated at earlier HAZOP stages. Operators within the high hazard industries are required to demonstrate that “all measures necessary” have been taken to prevent, control and mitigate major accident hazards. A fundamental part of this demonstration is compliance with accepted good practice and the implementation of inherently safer design principles when at the design stages. Early phase HAZOP studies such as HAZOP#1 use checklist approaches to quickly screen through proposed designs and to look for risk reduction opportunities at the inherent safety level of the hierarchy of risk.

Late HAZOP Stages – HAZOP#6

For both newly installed and existing plants and processing facilities there is a requirement for an on-going review of PHA’s which includes the consideration of operational experience and review of past accidents. Such requirements should be driven by the companies’ procedures for the management of risk assessments and are typically performed as a HAZOP#6. Functional safety standards, such as BS EN 61511 2017, also require FSA stage 4, a part of which includes a review of the underlying PHA.

For new plants and processes, this might at first seem excessive since they should have already been subjected to rigorous PHA’s / HAZOP studies prior to commissioning. Such studies, however, are based upon assumptions which might not be correct and only reveal themselves after a period of operation whereby without correction can lead to process operators “making do” and finding “workarounds”. For existing plants, a deterioration of safeguards over time can occur in addition to the changing nature of what constitutes accepted good practice.

In both instances, the re-review process is rooted in accepted good practice and is an essential part of asking “what more can I do to reduce risks” and, as such, is integral in demonstrating that all measures necessary have been taken to prevent, control or mitigate major accident hazards.

For more information or to discuss how we can help your business please get in touch.

Recent posts

  • Abstract dripping with green colored water
    Insight

    23 November 2026

    4 minutes read

    Update: Canada’s Greenwashing Bill C-15 Changes

    by Melissa Birch, Michelle Gluck, Tarra Tamang


    View post
  • Silhouette of a high voltage electricity pylon with glowing blue digital light beams on power lines against a dramatic colorful sunset sky.
    Insight

    23 November 2026

    4 minutes read

    COP31: No deal in Antalya, but the realities for business are the same


    View post
  • Flooded river
    Insight

    23 November 2026

    7 minutes read

    Making room for the river: Why urban flood and erosion risk needs more than a single fix

    by Jack Clothier


    View post
See all posts