Masterplan for Oughtibridge

Client Name
CEG
Location
Oughtibridge, Sheffield, UK

Challenge

Situated to the North of Sheffield, the 14ha site lies on the banks of the River Don within a Green Belt and historic woodland setting. SLR's Place team were appointed to prepare a masterplan that could address a range of physical and environmental constraints but also draw out the fantastic potential to create a characterful new place.

Solution

Development of the complex site involves addressing issues such as extensive flooding and level changes as well as an interface with a major highway on the periphery of the site. SLR worked closely with the wider technical team to refine the approach, designing out a number of cost elements that have been inhibiting delivery of the original permission.

Impact

The new proposals included the retention of a number of mature trees and refurbishment of characterful existing structures, increasing the range of uses and overall development value of the site.

© Crown copyright and database rights 2016 Ordnance Survey 0100031673. Aerial imagery © 2016 Google


Related projects

See all projects
  • Project

    Wantage, UK

    Lands Improvement Holdings / St. Modwen

    Built Environment

    Crab Hill: A new urban extension


    Read more
  • Project

    Islay

    ScottishPower Renewables

    Built Environment

    Demonstration Tidal Array in the Sound of Islay


    Read more
  • Project

    Edinburgh

    Royal High School Preservation Trust (RHSPT)

    Government & Communities

    Former royal high school undertake townscape and visual assessment


    Read more