Control of parking garage vibrations in research and healthcare facilities

Post Date
02 May 2023
Read Time
1 minute

The densification of urban education and healthcare campuses is driving the development of taller buildings that house continuously evolving technologies and treatments. A by-product of ‘building up’ is challenges with co-location of incompatible spaces from a noise and vibration perspective. Some increasingly common examples include mid-level mechanical floors stacked above/below acoustically-sensitive areas; vibration-sensitive research and medical tools above ambulance or loading bays; and parking garages that share structure with low-noise and low-vibration environments. These challenges are creating a paradigm shift in the vibration design of structures, whereby the structural scheme that satisfies ultimate limit states may no longer be sufficient to meet serviceability requirements.

In this paper we discuss the co-location of parking structures with vibration-sensitive spaces, and share some of the approaches to control that we have applied during the design of research labs and hospitals.

  • First, we provide an overview of the nature of vehicle vibrations, which is important to understanding some of the approaches to source control.
  • This is followed by a discussion on serviceability criteria.
  • Finally, we provide some practical guidelines for control of vehicle vibrations in sensitive spaces.

Download the full document to read more about how our specialists provide practical guides to control vehicle vibrations in sensitive spaces.

SLR Technical Paper - Control of parking garage vibrations in research and healthcare facilities

Recent posts

  • Scientist taking water sample from a river
    Insight

    09 June 2025

    7 minutes read

    The evolving PFAS regulations in Canada: What you need to know

    by Krista Barfoot, Melissa Birch


    View post
  • Ventilation pipes on the facade of computer data center
    Insight

    06 June 2025

    4 minutes read

    A focus on air quality: Data centre feasibility studies and site selection

    by Morgan Fitzpatrick


    View post
  • Mine site at sunset
    Insight

    04 June 2025

    7 minutes read

    Part 3 Sustainable Mining Practices: Securing Closure Capital from Exploration to Reclamation

    by Jim McKinley


    View post
See all posts