Hydrological & Geotechnical Assessment of N4 / N15 Road Scheme
Related Projects
Inert Landfill Planning Application
Coal Mine Mid Term Plan Development
Groundwater Level Modelling | Country: | Ireland |
| Location: | Co. Sligo |
| Sector: | Infrastructure |
| Services: | Hydrogeology Geotechnical Services Geological Services Environmental Impact & Strategic Environmental Assessments |
Project Objectives:
SLR Consulting acted as geotechnical and hydrogeological sub-consultant for the initial planning and preliminary design of a proposed new €180m 26km dual carriageway from Hughes Bridge in Sligo Town to the county boundary with Leitrim.
Our Role:
Our brief includes:
- scoping and preparation of Contract Documentation for the preliminary ground investigation
- technical supervision and contractual administration of the preliminary ground investigation (contract value €610,000)
- preparation of geotechnical interpretative reports for route mainline, including geotechnical cross-sections.
- provision of geotechnical advice in respect of 22 No. bridge structures,
- advising on engineering design requirements and road construction impacts in karst aquifer and low-lying peat environments
- advising on strategies for construction management of large volume of excavated peat waste
- undertaking baseline studies and preparing impact assessments for the Soils and Geology and Hydrogeology chapters of the Environmental Impact Statement (EIS)
